10
bedrooms
10
bathrooms
Lot dimensions
8,020 ft² (745.08 m²)
External facing:
- Brick
Foundation:
- Cast concrete
Frame:
- Wooden part on part
Roof:
- Gravel and asphalt
Floor coverings:
- Linoleum
Windows:
- Aluminium
- Wood
Heating source:
- Electric
Electric system:
- 100 amps
- 60 amps
- Breakers panel
Features:
- Alarm system
Basement:
- Partially finished
- Concrete
- Separate entrance
- Potential income
Upgrades:
- Heating
- Electrical
- Floors
- Doors
Parking / Driveway:
- Crushed Gravel
Location:
- Public transportation
Lot description:
- River / Waterfall
Near Commerce:
- Supermarket
- Drugstore
- Bank
- Restaurant
Near Health Services:
- Hospital
- Dentist
- Medical center
Near Educational Services:
- College
- University
Near Recreational Service:
- Sportif center
- Library
- Museum
- Bicycle Path
Owners’ comments
Automated translation
Original comments
NOTE: WE CURRENTLY HAVE A SIGNED OFFER TO PURCHASE, THE FULFILMENT OF THE CONDITIONS IS SCHEDULED FOR FEBRUARY 17. Thank you!
- Rental building of 10 apartments.
- Annual income of $67,140.
- Very good occupancy rate.
- Downtown Saint-Jérôme and all its services.
- Works carried out: replacement of balconies, major renovation of several apartments, etc.
- Other improvements (2019-2020): installation of circuit breaker electrical panels, new commercial gas water heater, alarm/fire system update, corridor floors, exterior pore replacement,
- Work to come: finishing the soffits, complete the work in the corridors.
NOTE: NOUS AVONS ACTUELLEMENT UNE OFFRE D'ACHAT SIGNÉE, LA RÉALISATION DES CONDITIONS EST PRÉVUE POUR LE 17 FÉVRIER. Merci!
- Immeuble locatif de 10 appartements.
- Revenu annuel de 67 140$.
- Très bon taux d'occupation.
- Centre-ville de Saint-Jérôme et l'ensemble de ses services.
- Travaux effectués : remplacement de balcons, rénovation majeure de plusieurs appartements, etc.
- Autres améliorations (2019-2020) : installation de panneaux électrique à disjoncteurs, nouveau chauffe-eau commercial au gaz, mise à jour du système d'alarme/incendie, couvre planchers des corridors, remplacement des pores extérieur,
- Travaux à venir : finition des soffites, compléter les travaux dans les corridors.